Winter Slips and Storage
Winter Storage Slips: | October 15th to May 15th $17 per foot based on length of slip $100 Winter Associate Membership Fee Electricity individually metered at every slip |
Winter Upland Storage Rates: |
October 15th through May 15th. |
Shrink Wrapping: |
$19.00 per foot on land. $22.00 per foot in water. Door |
Labor Rates: |
$50.00 per hour |
* Bottom Power Wash: |
No charge up to one hour only. |
Updated 12/14/2017